6
Initial operation
6.4
Adapting universal shaft
42
EasyCut B 870 CV Collect
Original Operating Instructions 150000707_01_en
Category II (cat. II)
Loosen the linch pin (3) and pull out the top link pin (1).
Insert the top link pin (1) in the position (I) or (II) and through the ball sleeve cat. II (2).
The thicker journal of the top link pin (1) is facing outwards.
Secure the top link pin with the linch pin (3).
Make sure that the anti-twist lock (4) of the top link pin is in the recess.
Category III (cat. III)
Insert the top link pin (1) in the position (I) or (II) and through the ball sleeve cat. III (2).
The thinner journal of the top link pin (1) is facing outwards.
Secure the top link pin with the linch pin (3).
Make sure that the anti-twist lock (4) of the top link pin is in the recess.
6.4
Adapting universal shaft
KMG000-047
ü
The machine is connected to the tractor,
Raise machine until the PTO shaft end of the tractor and the drive shaft of the machine are
on the same height.
Lower machine into working position.
Shut down and safeguard the machine,
.
Disassemble the universal shaft.
Install each half (1, 2) on the tractor and machine side respectively.
Shorten section tubes and guard tubes.
NOTICE:
Material damage caused by failure to achieve profile overlap! Observe an
overlap (shift length) of the profile tubes and guard tubes of at least 200 mm, refer to the
operating instructions of the universal shaft manufacturer.
Check the overlap of profile tubes and guard tubes.