
Start-up – John Deere
52
ECF00127
2
3
1
II
I
4
6
II
1
5
6
Fig. 34:
•
Loosen the locking pins (1).
To do this:
•
Remove the linch pin (3) and move screw (3) from
pos. II
to
pos. I
.
•
Lower the feed drive housing (4) until the holding bracket (5) is positioned under the
cross-pipe (6) of the maize header support panel.
•
Move the forage harvester back.
Pos : 17 /BA/-----Sei tenumbruch------ @ 0\mod_1196175311226_0.doc @ 4165
Summary of Contents for EasyCollect 6000 FP
Page 123: ......