
Start-up -CLAAS
31
Pos : 14.27 /Ü berschriften/Ü berschriften 2/A-E/Ankuppel n @ 16\mod_1233156207726_78.doc @ 180144
4.7
Coupling
Pos : 14.28 /BA/Inbetri ebnahme/Vors ätz e/M aisgebiss/C LAAS/T ype 491,492 @ 16\mod_1235567555854_78.doc @ 198943
4.7.1
Type 491, type 492
Pos : 14.29 /BA/Inbetri ebnahme/Vors ätz e/M aisgebiss/C LAAS/Ankuppeln CLAAS T ype 491,492 T 1 @ 16\mod_1233156349288_78.doc @ 180169
1
2
3
4
5
ECF00003_2
6
8
7
Fig. 12:
•
Move the forage harvester up to the maize header so that the feed drive housing (1) of
the forage harvester is directly in front of the adapter frame (2).
•
Lower the feed drive housing until the holding bracket (3) is positioned under the
receiving pockets (4) of the maize header.
•
Move the forage harvester forward until the holding bracket (3) catches in the openings
(5) of the holder (4).
•
Raise the feed drive housing with the lifting hydraulics until the lower holders (6) are lying
on the shaft (7) of the feed drive housing.
•
Stop the machine.
•
Align the holders (6) and tighten the screws.
•
Install the lock hook (8).
Note
Check to make certain the feed drive housing is correctly hooked into the
receiving pockets and lower holders.
Pos : 14.30 /BA/-----Seitenumbruc h------ @ 0\mod_1196175311226_0.doc @ 4165
Summary of Contents for EasyCollect 6000 FP
Page 123: ......