![Krone Big Pack 1270 HS Original Operating Instructions Download Page 207](http://html1.mh-extra.com/html/krone/big-pack-1270-hs/big-pack-1270-hs_original-operating-instructions_2004791207.webp)
Settings
207
Pos: 32.105.9 /BA/Einstellungen/Großpackenpresse/Presskolbeneinstellung/Laufschienenreinigung @ 24\mod_1241423347774_78.doc @ 243762
10.9.2
Cleaning the running rails
Fig. 147
The cleaning rails (2) are positioned on the four rollers (3). They remove dirt deposits from the
running rails of the baling ram. To adjust, loosen the screws (1) and adjust the cleaning rails to
the dimension a = 1 - 2 mm. Tighten the screws again.
Note
The cleaning rails (2) must be able to tilt easily on the roller axis!
Pos: 32.105.10 /BA/Einstellungen/Großpackenpresse/Presskolbeneinstellung/Seitliche Einstellung des Kolbens @ 24\mod_1241423485915_78.doc @ 243786
10.9.3
Lateral setting of the plunger
Fig. 148
The baling ram must be aligned in the centre of the bale channel chamber.
Make sure that the plunger moves freely and does not scrub against the fixed scrapers in the
bottom of the channel and below the knotter mechanism.
To align the plunger laterally, the plunger (2) can be moved to its forward-most position by
turning the flywheel.
The plunger (2) can be aligned laterally with compensating plates (1) (283-676-0) that are
mounted between the plunger (2) and the sliding discs (3). The plunger should have a gap
dimension of a = 1 - 2 mm at the narrowest point of the bale channel chamber.
Pos: 32.105.11 /BA/-----Seitenumbruch------ @ 0\mod_1196175311226_0.doc @ 4165
Summary of Contents for Big Pack 1270 HS
Page 12: ...Foreword 12 Pos 7 BA Seitenumbruch 0 mod_1196175311226_0 doc 4165 ...
Page 323: ......