![Krone Big Pack 1270 HS Original Operating Instructions Download Page 191](http://html1.mh-extra.com/html/krone/big-pack-1270-hs/big-pack-1270-hs_original-operating-instructions_2004791191.webp)
Settings
191
Pos: 32.77 /BA/Einstellungen/Großpackenpresse/Garnriegel/Einstellung des Garnriegels Maß b (Doppelknoter) @ 21\mod_1239175253752_78.doc @ 230622
10.6.2
Setting the twine bar (double knotter)
Fig. 127
For the double knotter, the setting of the twine bar should be made with the second knotting.
To do this:
•
Trigger the tying process manually with machine at a standstill
•
Turn the needle yoke manually on the flywheel in working direction upwards and
complete the first knot (closing knot)
•
Move the flywheel manually onwards until the twine bars swivel over the channel slots for
the second time
•
As soon as the twine bar grasps the twine, engage the flywheel brake to lock the needles
in this position
In this position the overreach “b” (distance of twine tip to twine) must have 5 - 10 mm. The
setting is made by loosening the screws (3) and (4) of the twine bar (1).
Pos: 32.78 /BA/-----Seitenumbruch------ @ 0\mod_1196175311226_0.doc @ 4165
Summary of Contents for Big Pack 1270 HS
Page 12: ...Foreword 12 Pos 7 BA Seitenumbruch 0 mod_1196175311226_0 doc 4165 ...
Page 323: ......