31
Experts in heating
User Manual
Twin Bio
- PLV 09.13
7
. Installation
7.H. Ceramic chamber installation and removal
The Twin Bio boiler is equipped with a ceramic chamber which enhances its effi ciency and reduces its emissions.
List of ceramic chamber elements:
1. ceramic chamber bottom cover
2. ceramic chamber burner side cover
3. ceramic chamber cap side cover
4. ceramic chamber rear cover
5. ceramic chamber top cover
6. ceramic chamber thermal insulation
7. ceramic chamber thermal insulation
Start the removal of the ceramic chamber by taking out the Platinum Bio burner. Then remove elements in the following order:
5; 2; 3; 4; 1; 7; 6. For installation reverse the procedure.
7.I. Boiler control system installation
The Twin Bio boiler control system includes a Platinum Bio
control. The control is a wall mounted device, secured with
bolts.
CAUTION!
Platinum Bio control system installation method must
guarantee rigid installation.
Position of control system must correspond to the conditions
of the ergonomic use (e.g. by providing suitable installation
height for easy installation) and easy access.
The electrical system connecting Platinum Bio control system
and the Twin Bio boiler must be protected against damage
caused by the use of a device (boiler) by installation on the fl at
surface (wall) with cable mounting brackets – avoid hanging
cables which may obstruct control system access and cause
health hazard.
Summary of Contents for 4062852055092
Page 1: ...E N G L I S H E N...
Page 2: ......
Page 4: ......
Page 41: ......
Page 42: ......
Page 43: ...D E U T S C H D E...
Page 44: ......
Page 46: ......
Page 83: ......
Page 84: ......
Page 85: ...R U...
Page 86: ......
Page 88: ......
Page 89: ...89 Twin Bio PLV 09 13 VI Twin Bio 1 2 3 4 Twin Bio 5 6 7 8 9 10 11 12 13...
Page 96: ...96 Twin Bio PLV 09 13 4 Twin Bio 4 E A 1595 mm B 88 mm 02 1 2 3 4 1 2 3 4 02 4 H...
Page 97: ...97 Twin Bio PLV 09 13 4 Twin Bio 4 F KOSTRZEWA 286 Platinum Bio DX01 02 Twin Bio...
Page 100: ...100 Twin Bio PLV 09 13 5 5 5 A a A1 mm 500 B1 mm 700 C1 mm 500 H1 mm 2000 g mm 50...
Page 101: ...6 Uruchamianie 101 Twin Bio PLV 09 13 5 B 0 05 50 20x20 2 25 14x14 2 5 C 45 C 40 50 15 C...
Page 102: ...102 Twin Bio PLV 09 13 5 M M M c w u Platinum Bio GSM Twin Bio...
Page 103: ...103 Twin Bio PLV 09 13 5 c w u Platinum Bio M M M GSM Twin Bio...
Page 104: ...104 Twin Bio PLV 09 13 5 M M M Platinum Bio GSM Twin Bio c w u...
Page 107: ...107 Twin Bio PLV 09 13 5 6 5 G 5 H 6 6 A 6 B 5 D 30 C 6 C...
Page 108: ...108 Twin Bio PLV 09 13 6 6 D KOSTRZEWA www kostrzewa com pl ON 6 E...
Page 109: ...109 Twin Bio PLV 09 13 6 7 7 7 A...
Page 110: ...110 Twin Bio PLV 09 13 7 7 B 1 2 3 4 5...
Page 111: ...111 Twin Bio PLV 09 13 7 7 C 1 2 3 4 5...
Page 112: ...112 Twin Bio PLV 09 13 7 7 D 1 2 3 4 5...
Page 113: ...113 Twin Bio PLV 09 13 7 7 E 1 2 3...
Page 114: ...114 Twin Bio PLV 09 13 7 7 F 1 7 G 1 2 3...
Page 116: ...116 Twin Bio PLV 09 13 7 7 J 2 1 2 1 1 2 3 4 5 6 7 K 200 C 1 OFF 2 3 4 5 6 7 8 ON 9 70 C 10...
Page 118: ...118 Twin Bio PLV 09 13 8 8 1 8 A 8 B a 6 STB 12 STB 1 Platinum Bio v02 2 8 C a...
Page 119: ...119 Twin Bio PLV 09 13 8 1 a 2...
Page 120: ...120 Twin Bio PLV 09 13 8 3 4...
Page 121: ...121 Twin Bio PLV 09 13 8 9 24 08 1991 81 11 06 2006 80 06 Platinum Bio 9 60 C...
Page 122: ...122 Twin Bio PLV 09 13 10 11 12 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 45 C...
Page 123: ...123 Twin Bio PLV 09 13 13 13 a STB STB...
Page 124: ...124 Twin Bio PLV 09 13 13...
Page 125: ......
Page 126: ......