23
Experts in heating
User Manual
Twin Bio
- PLV 09.13
5
.
D
esi
g
n
gu
idelines | 6. Boiler start-
u
p, operation...
5.G. Selecting the nominal heat output
of a boiler
The nominal boiler heat output must correspond to the heat
demand.
The heat demand for domestic hot water and central heating
systems is determined in accordance with the relevant
standards and regulations.
The process heat demand is calculated in accordance with
the relevant requirements of the production processes for
an individual plant. The nominal heat output of the boiler
must be selected by an authorised person based on thorough
calculations. Do not oversize the boiler
5.H. System venting
Water heating system venting must conform to the relevant
standards and regulations.
6. Boiler start-up, operation and stop
including emergency stop
6.A. Boiler inspection
Check the following before fi lling the boiler with water:
• boiler internal checks – clean and check the internal
insulation (fi re bricks);
• check movable parts, especially pressurised;
• check valves, especially safety valve;
• check controls, gauges, regulators (e.g. boiler control
system);
• boiler external checks – external insulation, boiler casing
etc.;
• check connected systems.
Remove any defects and faults in the boiler operation. Perform
a water test after major repairs, pressurised part replacement
and long downtimes.
6.B. Filling boiler and system
System and boiler feed water must meet the design
requirement, see section 5.D. ‘Water quality requirements’.
The difference between the feed water temperature and the
boiler shell temperature (ambient temperature) must be as low
as possible – a threshold difference of 30°C is recommended.
If this condition cannot be met, extend the boiler fi lling time.
Filling procedure:
• open feed valve;
• open return valve;
• open fi lling valve;
• check boiler and system condition and pressure device
integrity.
6.C. Start-up preparation
Check the following before boiler start-up:
• check if all the safety and fi re regulations and guidelines
in the quick guide to the safety and fi re regulations for
fuel systems and all components including ducts, valves,
controls, pumps etc. regarding gas tightness are followed;
• check system pressure – if the system pressure is too
low, increase the pressure (with a low fl ow rate to reduce
the volume of air introduced to the system);
• check fuel level in the storage hopper (refi ll if necessary
to allow installation of the storage hopper cover);
• check fuel level – check if the storage hopper is free from
foreign material (stones, steel parts etc.) which may affect
fuel conveying, burner operation or cause damage to feeder
components;
• check fl ue system – check if all fi re regulations are followed;
• check wiring system;
• check auxiliary equipment (e.g. swirl vanes, if installed);
• check boiler room ventilation system;
• check boiler condition (closed door side, cleanouts, pipe
stoppers, etc. and gas tightness).
Summary of Contents for 4062852055092
Page 1: ...E N G L I S H E N...
Page 2: ......
Page 4: ......
Page 41: ......
Page 42: ......
Page 43: ...D E U T S C H D E...
Page 44: ......
Page 46: ......
Page 83: ......
Page 84: ......
Page 85: ...R U...
Page 86: ......
Page 88: ......
Page 89: ...89 Twin Bio PLV 09 13 VI Twin Bio 1 2 3 4 Twin Bio 5 6 7 8 9 10 11 12 13...
Page 96: ...96 Twin Bio PLV 09 13 4 Twin Bio 4 E A 1595 mm B 88 mm 02 1 2 3 4 1 2 3 4 02 4 H...
Page 97: ...97 Twin Bio PLV 09 13 4 Twin Bio 4 F KOSTRZEWA 286 Platinum Bio DX01 02 Twin Bio...
Page 100: ...100 Twin Bio PLV 09 13 5 5 5 A a A1 mm 500 B1 mm 700 C1 mm 500 H1 mm 2000 g mm 50...
Page 101: ...6 Uruchamianie 101 Twin Bio PLV 09 13 5 B 0 05 50 20x20 2 25 14x14 2 5 C 45 C 40 50 15 C...
Page 102: ...102 Twin Bio PLV 09 13 5 M M M c w u Platinum Bio GSM Twin Bio...
Page 103: ...103 Twin Bio PLV 09 13 5 c w u Platinum Bio M M M GSM Twin Bio...
Page 104: ...104 Twin Bio PLV 09 13 5 M M M Platinum Bio GSM Twin Bio c w u...
Page 107: ...107 Twin Bio PLV 09 13 5 6 5 G 5 H 6 6 A 6 B 5 D 30 C 6 C...
Page 108: ...108 Twin Bio PLV 09 13 6 6 D KOSTRZEWA www kostrzewa com pl ON 6 E...
Page 109: ...109 Twin Bio PLV 09 13 6 7 7 7 A...
Page 110: ...110 Twin Bio PLV 09 13 7 7 B 1 2 3 4 5...
Page 111: ...111 Twin Bio PLV 09 13 7 7 C 1 2 3 4 5...
Page 112: ...112 Twin Bio PLV 09 13 7 7 D 1 2 3 4 5...
Page 113: ...113 Twin Bio PLV 09 13 7 7 E 1 2 3...
Page 114: ...114 Twin Bio PLV 09 13 7 7 F 1 7 G 1 2 3...
Page 116: ...116 Twin Bio PLV 09 13 7 7 J 2 1 2 1 1 2 3 4 5 6 7 K 200 C 1 OFF 2 3 4 5 6 7 8 ON 9 70 C 10...
Page 118: ...118 Twin Bio PLV 09 13 8 8 1 8 A 8 B a 6 STB 12 STB 1 Platinum Bio v02 2 8 C a...
Page 119: ...119 Twin Bio PLV 09 13 8 1 a 2...
Page 120: ...120 Twin Bio PLV 09 13 8 3 4...
Page 121: ...121 Twin Bio PLV 09 13 8 9 24 08 1991 81 11 06 2006 80 06 Platinum Bio 9 60 C...
Page 122: ...122 Twin Bio PLV 09 13 10 11 12 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 45 C...
Page 123: ...123 Twin Bio PLV 09 13 13 13 a STB STB...
Page 124: ...124 Twin Bio PLV 09 13 13...
Page 125: ......
Page 126: ......