Commissioning/configuration
© 2022 KOSTAL Solar Electric GmbH
59
6.3 Example of DIP setting depending on
application
NOTE
Bank 2 (S2):
If the values for your installation deviate from this example, e.g. for a house
connection fuse of only 50 A, this must be adapted using the DIP switches.
Settings for
bank 2 (S2)
in this example:
■
The maximum charging current per phase is set to
16 A
(bank 2 / DIP 1-3).
■
The maximum current for the house connection is set to
63 A
(bank 2 / DIP 6-8).
ENECTOR without energy meter
KSEM
LAN
L1
L2
L3
L1
L2
L3
N
LAN
STATUS
NETWORK
SERIAL BUS
REST
Smart Energy Meter
ON
OFF
1
2
4
5
3
6
7
8
ON
Bank 2 (S2)
63 A
3x16 A
11 kW
1
2
4
5
3
6
7
8
ON
Bank 1 (S1)
ON
OFF
Bank
DIP switch
8
7
6
5
4
3
2
1
2
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
1
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ENECTOR with KOSTAL Smart Energy Meter and convenience functions
KSEM
LAN
L1
L2
L3
L1
L2
L3
N
LAN
STATUS
NETWORK
SERIAL BUS
REST
Smart Energy Meter
1
2
4
5
3
6
7
8
ON
ON
OFF
1
2
4
5
3
6
7
8
ON
Bank 2 (S2)
63 A
3x16 A
11 kW
Bank 1 (S1)
ON
OFF
Bank
DIP switch
8
7
6
5
4
3
2
1
2
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF