![Komatsu PW98MR-10 Operation & Maintenance Manual Download Page 320](http://html1.mh-extra.com/html/komatsu/pw98mr-10/pw98mr-10_operation-and-maintenance-manual_1991292320.webp)
k
k
CAUTION
When installing the cover (6), check O-ring (10) for scratches or damages and replace O-ring with a new
one if any.
9.
Install cover (6) according to the following procedure.
1) Set a new outer element (7).
2) Align matchmarks (11) on the body and cover (6).
3) Install cover (6) and fix it with clip (5).
10. Press the button of dust indicator (3) and return the red
piston.
Replace element
1.
Open battery inspection cover (4) on the left side of the
machine.
2.
Remove clips (5) (3 pieces) and remove cover (6).
MAINTENANCE PROCEDURE
MAINTENANCE
4-16
WENAM00061
Summary of Contents for PW98MR-10
Page 1: ......
Page 2: ......
Page 9: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 7 WENAM00061...
Page 68: ...WENAM00061...
Page 73: ...CONTROLS AND GAUGES NAMES OPERATION GENERAL VIEW 3 5 WENAM00061...
Page 157: ...SWITCHES OPERATION EXPLANATION OF COMPONENTS 3 89 WENAM00061...
Page 388: ...WENAM00061...
Page 389: ...SPECIFICATIONS 5 1 WENAM00061...
Page 392: ...RKA55390 SPECIFICATIONS SPECIFICATIONS 5 4 WENAM00061...
Page 402: ...WENAM00061...
Page 428: ...WENAM00061...
Page 429: ...REPLACEMENT PARTS 7 1 WENAM00061...
Page 445: ......
Page 446: ......