155
⑥
Sight the prism center, click
[Measure] to start measure. Ask the
rodman to move prism making
“Away” and “↑” display as 0.
⑥
When four items are 0, the
point to be set out is found.
“Cut” item indicates the
dig/fill value.
When it is positive, it means to dig.
When it is minus, it means to fill.
⑧
After finish setting out one point,
click [Enter] to quit. The screen
returns to Alignment Setout main
screen.
Click
[LOFS]/[ROFS]
,
or
+CHG/-CHG, repeat steps
②~⑥
to finish setting out other points.
※
1)
※
1) Press [LOFS] (or [ROFS]), corresponding chainage, offset, elevation difference will be displayed
on the screen. The chainage and offset can be entered manually. If the offset is minus, the offset point
is at the left side to center line.If the offset is positive, the offset point is at the right side to center line.
Explanation for the main setout screen: