2
1478624-W2-A
PLEASE observe the following To reduce the risk of injury:
Installing the Shower
1.
Installation of the shower must be carried out in accordance with
these instructions by qualified, competent personnel. Read all
instructions before installing the shower.
2.
DO NOT
install the shower where it may be exposed to freezing
conditions. Ensure that any pipework that could become frozen
is properly insulated.
3.
DO NOT
perform any unspecified modifications to the shower
or its accessories. When servicing only use genuine Kohler Mira
replacement parts.
4.
If the shower is dismantled during installation or servicing then,
upon completion, an inspection must be made to ensure all
connections are tight and that there are no leaks.
Using the Shower
5.
The shower must be operated and maintained in accordance with
the requirements of this guide. Make sure you fully understand
how to operate the shower before use, read all instructions and
retain this guide for future reference.
6. DO NOT
switch the shower on if there is a possibility that the water
in the shower unit or fittings is frozen.
Safety Information
WARNING ! This shower can deliver scalding temperatures. For
continued safe operation, follow all instructions, warnings and
cautions contained in this guide and on or inside the shower.
Periodic maintenance may be required to keep the product in
good working order.
The function of a thermostatic mixing valve is to deliver water
consistently at a safe temperature. In keeping with every other
mechanism, it cannot be considered as functionally infallible and
as such, cannot totally replace a supervisor’s vigilance where that
is necessary. Provided it is installed, commissioned, operated
and maintained within manufacturers recommendations, the
risk of failure, if not eliminated, is reduced to the minimum
achievable.