ProLine P16800
31
5 Commissioning
01.
Set the desired function using the DIP switches.
02.
Mount P16800.
03.
Electrically install the P16800.
Electrical Installation, p. 24
04.
Check functionality of the P16800.
ProLine P16800
31
5 Commissioning
01.
Set the desired function using the DIP switches.
02.
Mount P16800.
03.
Electrically install the P16800.
Electrical Installation, p. 24
04.
Check functionality of the P16800.