KLINGER Denmark A/S | Nyager 12-14 | DK-2605 Brøndby | +45 43 64 66 11 | [email protected] | www.klinger.dk
Klinger CMF
Instruction Manual
Page 68
Chapter
Daily Care and Maintenance
8.1 Flowmeter Inspection
8.1.1 Daily inspection
Routing inspection is enough for Walsn mass flowmeter.
8.1.2 Inspection items and period
The Inspection period in table 9-1 is the general standard. Determine the appropriate period
of inspection based on site situation and environment.
Table 9-1 Flow meter check item
Items for
inspection
Inspection
period
Inspection and maintenance
Essentials
Remarks
Transmitter
display
At any time
Visual
Pay attention to all kinds of
alarm information
Vibration and
sound
Every day
Judge according to the sense of
hearing
Whether there is a change
compared with the usual
Appearance
check
According to
the status of
oil pollution
Cleaning with non-woven wipe or
compressed air
Please keep the flow meter
appearance clean
Fasteners
According to
the use of the
situation
the fasteners of flange, junction
box, transmitter housing cover &
conduit gland
Please fasten
Seal ring
According to
the use of the
situation
the seal rings of flange connection,
transmitter housing cover, junction
box & conduit
Replace rubber ring
Operation after power off
Annual
inspection
Once year
calibration if necessary
Adjust the characteristic
parameter according to the
result of the measurement
Comprehensive
inspection
At least once
in 5 years
Please contact the manufacturer
Please do not disassemble or
clean the flow meter
voluntarily