52.0" REQUIRES INSULATION SLEEVE
2.0"
34.0"
52.0"
42.0"
1/2" Gyprock
36.0"
MINIMUM FROM
BASE TO
CENTER OF
TERMINATION
MIN. LOW PROFILE
ENCLOSURES REQUIRES
INSULATION SLEEVE
NOTE
INSULATION SLEEVE MUST
COVER 7.0" FLEX PIPE FROM
FIREPLACE UP AND TO WALL.
SLEEVE FOR LOW PROFILE
ENCLOSURES MAXIMUM 34.0".
LOW PROFILE ENCLOSURE
42.0" TO 52.0" MUST MAINTAIN
A MINIMUM CLEARANCE OF
2.0" FROM TOP OF 7.0" FLEX
PIPE AND INSULATION SLEEVE.
52.0" AND HIGHER ENCLOSURE
MUST MAINTAIN 4.0" ABOVE 7.0"
FLEX PIPE WITHOUT INSULATION
SLEEVE.
NOTE
WITH USING DURA-VENT
PIPE AND ADAPTER MINIMUM
HEIGHT OF 52.0" MUST BE
MAINTAINED FOR PROPER
CLEARANCES. INSULATION
SLEEVE IS NOT REQUIRED.
THIS WILL LEAVE A 4.0"
MINIMUM CLEARANCE TO
COMBUSTIBLE TOP.
For
Propane Horizontal Installations
the venting
must be a minimum of one foot vertical off the flue
before the elbow on any horizontal runs of one foot
or greater. This allows for cleaner combustion and
greatly reduces carboning and cleaning of glass.
Does not apply to Back Flue models).
NOTE:
Clearance to back of unit and/or sides of unit
framed into walls require 6” minimum clearance to com-
bustibles. We recommend using two (2 x 4) studs placed
against the wall as per framing diagrams. See -
Locating your Appliance, for additional information.
Low Profile Enclosures - Louvered Unit Only
18
Summary of Contents for MDV31
Page 41: ...Gas Conversion for Modulator PART C WARNING WARNING 41...
Page 44: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 44...
Page 45: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 45...
Page 46: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 46...
Page 54: ...For Models MDV31 39 Replacement Parts continued 54...