
Step 26: Attach Newport Main Canopy
A:
Place Newport Main Canopy over (1919) Roof Ridge making sure bottom edges of tarp are even on both
sides of assembly. (fig. 26.1)
B:
Secure one side by attaching canopy to (1925) SW Top using 5 evenly spaced (S5) #8 x 1/2” Pan Screws
(with #8 flat washer). Make sure the screws are 1/2” in from the edge of the canopy. (fig 26.1)
C:
Make sure the canopy is smooth and tight then secure opposite end of canopy to (1981) Top Side using 5
evenly spaced (S5) #8 x 1/2” Pan Screws (with #8 flat washer). Make sure the screws are 1/2” in from the edge
of the canopy. (fig. 26.1)
D:
Attach canopy to (1919) Roof Ridge with 4 evenly spaced (S5) #8 x 1/2” Pan Screws (with #8 flat washer).
(fig. 26.1)
Fig. 26.1
1919
1981
1925
Hardware
14 x
#8 x 1/2” Pan Screw
(with #8 flat washer)
Other Parts
1 x Canopy
S5
S5
S5
S5
with #8 flat
washer
Canopy
with #8 flat
washer
with #8 flat
washer
x 4
46