
83
Step 31: Attach Elbow Assembly to Flange Assembly
Part 2
Note: When installing Pan Bolts make sure to look at holes so bolts
go through the side with the round recess and the lock nuts go
through the side with the hexagonal recess. Keep all bolts loose until
further step.
C:
Attach 1 TNR2 Slide Clamp Ring to the bottom of the joined Assemblies
using 2 (PB1) Pan Bolts (with LN1 lock nut) on one side and 1 (PB1) Pan
Bolt (with LN1 lock nut) in the other side, making sure to match the arrows
up with the end of the clamp ring (where a seam will be) as shown in fig.
31.5, 31.6 and 31.7.
D:
Connect the 2 TNR2 Slide Clamp Rings together in 2 spots using 1
(PB1) Pan Bolt (with LN1 lock nut) per hole. Make sure seams and arrows
line up and then tighten all bolts. (fig. 31.8 and 31.9).
Hardware
5 x
Pan Bolt
(LN1 lock nut)
PB1
Other Parts
1 x TNR2 Slide Clamp Ring
DO NOT USE
USE IMAGE
DO NOT USE
USE IMAGE
DO NOT USE
USE IMAGE
Bottom Slide Bolt Holes
Make sure
arrows are
aligned
After the clamp rings
are attached to the
elbows, fasten them
end to end with two
pan bolts and lock nuts
PB1
PB1
(Side not shown)
PB1
Fig. 31.5
Fig. 31.6
Fig. 31.7
Fig. 31.8
Fig. 31.9
LN1
LN1
LN1
Summary of Contents for Cedar Summit F29380
Page 15: ...15 9 mm mm Actual Size...
Page 119: ...119 NOTES...