
28
Step 4: Fort Assembly
Part 1
It is important to assemble the Fort Assembly on a flat, smooth surface.
A:
Place Swing Wall from Step 3 between 2 Side Walls from Step 1, noticing the wall orientations. The tops and
bottoms of the walls should be flush. Make sure the walls are square then using the pilot holes as a guide pre-
drill with a 3/16” (4.8mm) drill bit and fasten the left Side Wall to the Swing Wall and Swing Wall to the right Side
Wall with 4 (WL5) Wafer Lags per side. (fig. 4.1, 4.2 and 4.3)
Fig. 4.2
Fig. 4.1
Flush
Hardware
16 x
Wafer Lag
WL5
Flush
Notice left Side
Wall overlaps
Swing Wall
WL5
WL5
Notice Swing Wall
overlaps right Side Wall
Side Wall
Side Wall
Swing Wall
Side Wall
Swing Wall
Side Wall
Flush
Flush
Top View
WL5
Fig. 4.3
x 4 per
side
Notice grooves
face inwards
Notice counter sunk
holes on the outside
Left
Right
Left
Right
Summary of Contents for Cedar Summit F29380
Page 15: ...15 9 mm mm Actual Size...
Page 119: ...119 NOTES...