
38
D:
Flush to the ends and sides of both (9088) Tunnel Side Joist place 1 (9087) Floor Board followed by 7 (9092)
Floor Boards. Make sure the last board is flush to the ends of each (9088) Tunnel Side Joist then attach all floor
boards with 4 (S20) Wood Screws. (fig. 7.3)
E:
Measure 1-1/4” (32mm) in from both ends of each (9088) Tunnel Side Joist then attach 1 Swing Bracket
to each end with 1 (WB2) Wafer Bolt (with FW2 flat washer, connects to already installed t-nuts) per bracket.
Brackets must be flush to the bottom of the boards. (fig. 7.4)
Step 7: Tunnel Floor Assembly
Part 2
1 x
Floor Board
7 x
Floor Board
9087
Wood Parts
Hardware
9092
32 x
Wood Screw
4 x
Wafer Bolt (FW2 flat washer)
x 4 per
board
S20
1-1/4” (32mm)
9088
9088
9088
9088
S20
Flush
Flush
Flush
9087
9092
WB2
FW2
WB2
Swing
Bracket
Flush
x 4
x 4
x 4
Other Parts
4 x Swing Bracket
Fig. 7.3
Fig. 7.4
1-1/4” (32mm)
Summary of Contents for Cedar Summit F29380
Page 15: ...15 9 mm mm Actual Size...
Page 119: ...119 NOTES...