
37
A:
Tap in 2 (TN2) T-nuts in each (9088) Tunnel Side Joist. (fig. 7.1)
B:
With the (TN2) T-nuts at the bottom measure 1” (25mm) in from both ends of each (9088) Tunnel Side Joist
then attach 1 (9086) Tunnel Top to each end with 4 (S4) Wood Screws per board. Tops of boards to be flush.
(fig. 7.1)
C:
The distance diagonally from end of each (9088) Tunnel Side Joist must be 39-13/16” (1011mm). Tunnel
Floor Frame must be square. (fig. 7.2)
Step 7: Tunnel Floor Assembly
Part 1
4 x
T-nut
8 x
Wood Screw
2 x
Tunnel Side Joist
2 x
Tunnel Top
9088
Wood Parts
9086
TN2
S4
Hardware
S4
S4
1”
(25mm)
x 4
x 4
9088
9088
9086
9086
Flush
TN2
x 4
Fig. 7.1
Fig. 7.2
1010.5
39 25/32"
1010.5
39 25/32"
Top View
39-13/16”
(1011mm)
Summary of Contents for Cedar Summit F29380
Page 15: ...15 9 mm mm Actual Size...
Page 119: ...119 NOTES...