Warning!
To prevent tipping and avoid potential injury, stakes must be
driven 13” (330mm) into ground. Digging or driving stakes can be dangerous if
you do not check first for under-ground wiring, cables or gas lines.
Step 20: Attach Rock Wall Assembly to Fort
Part 2
Hardware
2 x
Pan Screw
2 x Rebar Ground Stake
Other Parts
Rebar
Ground
Stake
S7
S7
13” (330mm)
In Ground
C:
Drive 1 Rebar Ground Stake 13” (330mm) into the ground against 1 (2776) Rock Rail per assembly then attach
with 1 (S7) Pan Screw per ground stake. Be careful not to hit the washer while hammering stake into the ground
as this could cause the washer to break off. (fig. 20.5 and 20.6)
D:
After driving stake into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Fig. 20.5