
59
Wood Parts
Hardware
Other Parts
Step 19: Rock Wall Assembly
Complete Step 19, A-E twice to make 2 Rock Wall Assemblies.
A:
Lay 2 (2776) Rock Rails down, side by side with angled edges
facing down. (fig. 19.1)
B:
Place (2779) Access Board on the bottom of each (2776) Rock
Rail as shown in fig. 19.1. Make sure (2779) Access Board is flush to
the outside and bottom edges of each (2776). Attach using 4 (S20)
#8Wood Screws.
C:
7-5/8” (194mm) down from the top of both (2776) Rock Rails place
1 (2781) Rk Board B, making sure the sides are flush to the outside
edges of each (2776) Rock Rail. Attach using 4 (S20) Wood Screws.
(fig. 19.1)
D:
In between the (2779) Access Board and (2781) Rk Board B
stagger 2 (2781) Rk Board Bs and 2 (2780) Rk Board As using 4 (S20)
Wood Screws per board. Placing them as shown in fig. 19.1, this will
prevent rocks from forming a straight line. Make sure the boards are
evenly spaced and do not exceed 2-3/8” (60mm) between boards.
E:
Place 1 rock on each (2780) Rk Board A
and (2781) Rk Board B (fig. 19.2) and attach
using 1 (PB2) Pan Bolt (with lock washer,
flat washer and barrel nut) and 1 (S10) Pan
Screw per rock. The Screw must be in the
hole directly under the Pan Bolt, it will stop the
rock from spinning. (fig. 19.3)
Note: Gaps between boards 2-1/4”
(57mm), not to exceed 2-3/8” (60mm)
Note: The holes
in the rock boards
must orient to the
top of the boards.
7-5/8” (194mm)
Approx
Fig. 19.1
2779
2776
2780
2781
2781
2781
2780
Fig. 19.2
2 x
Access Board
6 x
Rk Board B
4 x
Rk Board A
4 x
Rock Rail
48 x Wood Screw
10 x
Pan Screw
10 x
Pan Bolt
(LW1 lock washer, FW0 flat washer & BN1 barrel nut)
2776
2780
2781
2779
Rock
10 x Rocks (6 green/4 yellow)
S10
S10
PB2
PB2
Fig. 19.3
x 4 per
board
S20
FW0
LW1
BN1
S20
Summary of Contents for Cedar Summit F29380
Page 15: ...15 9 mm mm Actual Size...
Page 119: ...119 NOTES...