
Fig. 32.2
Step 32: Transom Assembly
Part 2
Flush
Flush
Wood Parts
2 x
Wall Tie 15/16 x 3 x 19-1/4”
Hardware
16 x
#8 x 7/8” Truss Screw
8 x
#8 x 2” Wood Screw
S11
MOD 5 Pane Window
Fig. 32.3
324
325
S11
x 4 per Window
S0
S0
322
325
323
324
321
Other Parts
4 x MOD 5 Pane Window
B:
Place 2 MOD 5 Pane Windows in the openings and attach to (322) Right Upright, (323) Left Upright and (324)
Centre Upright with 4 (S0) #8 x 7/8” Truss Screws per window. (fig. 32.2)
C:
Attach (325) Wall Tie flush to the top of (321) TB Support and to (324) Centre Upright with 4 (S11) #8 x 2”
Wood Screws. (fig. 32.3)
D:
Repeat Steps A-C for a second Transom Assembly.
70
Summary of Contents for Cedar Summit COPPER RIDGE PLAYSET
Page 111: ...NOTES ...