
A
13
Hardware
Wood Parts
Step 11: Floor Assembly
Part 1
A:
Place 1 (111) Floor Board tight to (060) End Panel and 1 tight to (071) SW Wall Panel then attach each to the
(082) Side Joists with 4 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 11.1, 11.2 and 11.3)
B:
Place (112) Long Floor Joist tight to the bottom of each (111) Floor Board, centred over the pilot holes on the
(060)End Panel and (071) SW Wall Panel then attach with 2 (S4) #8 x 3” Wood Screws per panel. Attach (111)
Floor Board to (112) Long Floor Joist with 2 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 11.1, 11.2 and 11.4)
2 x
Floor Board 5/8 x 4-1/2 x 35-5/8”
1 x
Long Floor Joist 1-1/4 x 3 x 63-1/4”
12 x
#8 x 1-3/8” Wood Screw
4 x
#8 x 3” Wood Screw
111
Fig. 11.1
Fig. 11.2
Top View
Fig. 11.4
Fig. 11.3
S4
112
S20
060
071
111
111
111
112
112
112
Tight
x 6 per board
060
S4
A
13
A
13
A
13
x 2 per
side
S20
33
Summary of Contents for Cedar Summit COPPER RIDGE PLAYSET
Page 111: ...NOTES ...