
B:
B: Place EN71 Hand Rail so the top is flush to the inside edge of (073) Back Wall Panel and the bottom is
centred on (021) Left Access. Pre-drill holes using a 3/16” (4.8 mm) drill bit then attach EN71 Hand Rail using
2 (WL3) 1/4 x 1-3/8” Wafer Lags (with flat washer). (fig. 61.3, 61.4 and 61.5)
Hardware
Fig. 61.4
073
021
2 x
1/4 x 1-3/8” Wafer Lag
(1/4” flat washer)
Other Parts
1 x EN71 Hand Rail
Step 61: Attach Steel Hand Grips to Fort
Part 2
Flush
Flush
WL3
WL3
WL3
WL3
A
EN71
Hand
Rail
Fig. 61.3
Fig. 61.5
073
A
EN71
Hand
Rail
1/4” Flat
Washer
1/4” Flat
Washer
1/4” Flat
Washer
108
Summary of Contents for Cedar Summit COPPER RIDGE PLAYSET
Page 111: ...NOTES ...