
Fig. 29.3
295
294
054
D:
Install (294) Short Floor Gap using 4 (S20) #8 x 1-3/8” Wood Screws, making sure that it’s flush to the edge of
(054) Nest Joist Back. (Fig.29.3)
E:
In the remaining opening, center and install (295) Short Floor using 4 (S20) #8 x 1-3/8” Wood Screws. (Fig.29.3).
Step 29: Install Upper Floorboards
Part 2
1 x
Short Floor Gap 5/8 x 3-3/8 x 15-11/16”
1 x
Short Floor 5/8 x 3-3/8 x 15-11/16”
Wood Parts
294
295
52
S20
x 4 per
board
Hardware
8 x
#8 x 1-3/8” Wood Screw
S20
65
Summary of Contents for Cedar Summit COPPER RIDGE PLAYSET
Page 111: ...NOTES ...