
68
Step 26: Upper Back Wall Assembly
Part 2
B:
Tight to the bottom of (2243) Large Support L and (2244) Large Support and flush to the outside edges of
(2180) Post and (2181) Short Post attach (2335) Back Arch to (2180) Post and (2181) Short Post with 4 (S2) #8
x 1-1/2” Wood Screws. (fig. 26.2)
C:
Measure 9-1/2” from both (2180) Post and (2181) Short Post, then place 1 (0850) CE Wall Board at each
marked out location, each flush to the top of (2335) Back Arch and attach to (2335) Back Arch and (2186) Back
Front Wall with 4 (S1) #8 x 1-1/8” Wood Screws per board. (fig. 26.3)
D:
Measure 1” down from the top of (2186) Back Front Wall, pre-drill with a 1/8” drill bit then attach each (0850)
CE Wall Board to (2186) Back Front Wall with 1 (S1) #8 x 1-1/8” Wood Screw per board. (fig. 26.3)
Hardware
Wood Parts
1 x
Back Arch 1 x 5 x 48-7/8”
2 x
CE Wall Board 1 x 4 x 17”
2335
2181
4 x
#8 x 1-1/2” Wood Screw
10 x
#8 x 1-1/8” Wood Screw
S1
S2
0850
2180
Outside View
Fig. 26.2
Inside View
Fig. 26.3
2244
2243
2186
Flush
2335
0850
9-1/2”
1”
1”
S1
x 5 per
board
2181
2335
S2
S2
2180
Flush
Summary of Contents for BOULDER STATION
Page 98: ...98 NOTES...
Page 99: ...99 NOTES...