
42
Wood Parts
Hardware
Fig. 17.3
15 x
#8 x 1-1/2” Wood Screw
3 x
Floor Board 1 x 4 x 35-5/8”
2197
S2
Step 17: Floor Assembly
Part 2
B:
Tight to (2188) SW End and between both (2180) Posts attach 1 (2197) Floor Board to each (2164) Floor
Support and to (2165) Joist with 5 (S2) #8 x 1-1/2” Wood Screws. (fig. 17.3 and 17.4)
C:
Measure 42” from (2197) Floor Board and attach a second (2197) Floor Board to each (2164) Floor Support
and to (2165) Joist with 5 (S2) #8 x 1-1/2” Wood Screws. (fig. 17.3 and 17.4)
D:
Flush to the end of (2187) SL End and between both outside (2181) Short Posts attach 1 (2197) Floor Board
to each (2164) Floor Support, (2187) SL End and (2165) Joist with 5 (S2) #8 x 1-1/2” Wood Screws. (fig. 17.3
and 17.4)
Fig. 17.4
2165
S2
2164
2180
2187
Slide Wall
Swing Wall
2180
2164
2197
2181
Flush
Flush
Tight
42”
Top View
x 5 per
board
2180
2181
2197
Tight
2181
2197
2181
2197
2181
2197
2180
2164
2188
2188
Summary of Contents for BOULDER STATION
Page 98: ...98 NOTES...
Page 99: ...99 NOTES...