
30
C:
With bevelled ends facing up loosely attach 2 (2181) Short Posts to (2164) Floor Support with 1 (H11) 1/4 x
2-3/4” Hex Bolt (with lock washer, flat washer and t-nut) per board. Notice direction bolts are installed. (fig. 8.2
and 8.3)
D:
Loosely attach (2183) Front Rail to each (2181) Short Post and to (2336) Centre Post with 3 (H2) 1/4 x 2” Hex
Bolt (with lock washer, flat washer and t-nut). (fig. 8.2 and 8.4)
E:
Make sure assembly is square and ensure that the spacing between (2180) Post and (2179) Door Post is 27-
5/8” (fig. 8.2), then tighten all bolts and attach (2183) Front Rail to each (2181) Short Post with 2 (S2) #8 x 1-1/2”
Wood Screws. (fig. 8.2 and 8.4)
F:
Install one 1/4” T-nut into (2180) Post,
(2336) Centre Post and each
(2181) Short Post, as shown
in fig.8.2 and 8.3.
Hardware
Wood Parts
2 x
Short Post 2 x 4 x 49-3/4”
1 x
Front Rail 1 x 6 x 23”
2181
2183
Step 8: Front Wall Assembly
Part 2
Fig. 8.2
2180
3 x
1/4 x 2” Hex Bolt (1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
2 x
1/4 x 2-3/4” Hex Bolt (1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
2 x
#8 x 1-1/2” Wood Screw
4 x
1/4” t-nut
H11
S2
H2
2179
2181
2336
Inside View
H11
27-5/8”
2181
1/4” lock
washer
1/4” flat
washer
1/4” t-nut
Fig. 8.3
2181
1/4” t-nut x 4
H11
2183
2164
1/4” t-nut
1/4” t-nut
Outside View
2181
H2
S2
S2
1/4” lock
washer
1/4” flat
washer
1/4” t-nut
H2
2181
2336
2183
Fig. 8.4
Notice bevelled
edge facing up
Notice bolt direction
Summary of Contents for BOULDER STATION
Page 98: ...98 NOTES...
Page 99: ...99 NOTES...