
62
D:
From inside the assembly place 2
(2195) Siding Uprights over the pilot holes
of the (2193) Siding and flush to the top of
(2190) Wall Board. Attach to (2190) Wall
Board and (2184) SW Ground with 2 (S2)
#8 x 1-1/2” Wood Screws per board. (fig.
22.4)
E:
From outside of the assembly attach
(2193) Siding to (2195) Siding Uprights
with 2 (S0) #8 x 7/8” Truss Screws per
siding. (fig. 22.4 and 22.5)
Hardware
Wood Parts
4 x
#8 x 1-1/2” Wood Screw
12 x
#8 x 7/8” Truss Screw
S2
2 x
Siding Upright 5/4 x 2 x 25-1/4”
2195
Step 22: Lower Swing Wall Assembly
Part 2
2184
S0
2195
S0
x 2 per
board
2195
2190
2193
Fig. 22.4
Fig. 22.5
pilot
holes
Flush
2193
Inside View
Outside View
Flush
S2
S2
(in behind
boards)
Summary of Contents for BOULDER STATION
Page 98: ...98 NOTES...
Page 99: ...99 NOTES...