
Installation
P/N 06-237058-001
2-1
February 2012
CHAPTER 2
INSTALLATION
2-1
INTRODUCTION
This chapter is intended for system installers. It provides information necessary to successfully
prepare for and install the ARIES NET
Link
TM
control unit. Refer also to the Installer’s Wiring
Diagram, P/N 06-237046-001, that is packaged with the ARIES NET
Link
system.
2-2
PREPARING FOR INSTALLATION
Before beginning installation of the ARIES NET
Link
system, do the following:
1. Unpack the shipping carton.
Note:
The use of two people to lift the control unit out of its carton is recommended.
2. Gather all necessary materials and tools.
3. Determine a wall location for the control unit and peripherals.
2-2.1
Unpacking the System
Check the contents of the ARIES NET
Link
shipping carton(s) to ensure that you have received the
components listed below. (Refer to the Parts List in Chapter 8 for part numbers of some items.)
1. Remove the keys from the envelope taped to the top of the enclosure.
2. Disconnect the ground wire that connects the enclosure door to the enclosure.
3. Remove the control unit door first by unlocking it and then lifting the door up to allow the door’s
hinges to clear the mating-hinge pins on the enclosure.
4. Remove the separately packaged power supply unit, Power Management Unit Board, Main
Controller Board with attached Keypad/Display and installation hardware and documentation
from inside the enclosure. Set these parts and the door aside in a safe location to prevent damage.
5. Locate all optional system components ordered and set them aside in a safe location.
Note:
Optional components such as the Expansion Card Cage, Expansion Cards, additional Power
Supply Units, etc. will be packaged separately (not contained in the ARIES NET
Link
Enclosure).
2-2.1.1
STANDARD SYSTEM CONTENTS
•
Enclosure w/Door
•
Power Supply Unit, P/N 76-800030-002, with harness and hardware - quantity of one (1);
additional units may be ordered separately.
•
Power Management Unit (PMU) Board, P/N 76-800030-004, with harness and hardware
- quantity of one (1); additional units may be ordered separately.
•
Main Controller Board (MCB) with Keypad/Display, P/N 76-800020-001, with harnesses
and hardware - quantity of one (1); additional units may be ordered separately.
•
Operating Instructions, P/N 06-237049-001
Summary of Contents for ARIES NETLink
Page 2: ......
Page 14: ...Table of Contents February 2012 xii P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...List of Tables February 2012 xviii P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...Installation February 2012 2 56 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 194: ...Operation February 2012 4 28 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 250: ...Troubleshooting February 2012 7 28 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 293: ......