6. Place the top Test Set on top of the bottom Test Set. Ensure that the front frame is
positioned slightly forward of the locks that are attached to the bottom Test Set. Slide Test
Set back so that they are locked into position. Refer to
below.
Figure 1
5
Locking Feet for
the 24-Port System
7. Place the PNA-X on top of the two Test Sets. Ensure that the front frame is positioned
slightly forward of the Lock-Links that are attached to the top Test Set. Slide the analyzer
back so that they are locked into position. If the network analyzer's lower locking feet are not
aligned with the screw holes in the Test Set's upper locking feet, loosen the screws securing
the feet to the instrument slightly to align. Refer to
Top locking feet
Locking feet with
thumb screw (x2)
8. Connect the two Test Set I/O Cables (N4011-21002), included in the U3024/40-60001 kits, to
Keysight U3024AH10 User's and Service Guide
22
Summary of Contents for U3024AH10
Page 5: ...U3024AH10...
Page 52: ...Figure 38 Example 1 Test Set Signal Path 47 Keysight U3024AH10 User s and Service Guide...
Page 82: ...Figure 57 24 Port System Configuration 77 Keysight U3024AH10 User s and Service Guide...
Page 83: ...Figure 58 2 Way High Power Configuration 1 Watt Keysight U3024AH10 User s and Service Guide 78...
Page 105: ......