background image

possible injury. Read and follow all
installation, operation, and
maintenance information carefully
before using the product.

If this product is not used as specified,
the protection provided by the
equipment could be impaired. This
product must be used in a normal
condition (in which all means for
protection are intact) only.

The types of product users are:

Responsible body is the individual or
group responsible for the use and main-
tenance of equipment, for ensuring that
the equipment is operated within its spe-
cifications and operating limits, and for
ensuring operators are adequately trained.

Operators use the product for its intended
function. They must be trained in electrical
safety procedures and proper use of the
instrument. They must be protected from
electric shock and contact with hazardous
live circuits.

Maintenance personnel perform routine
procedures on the product to keep it oper-
ating properly (for example, setting the line
voltage or replacing consumable mater-
ials). Maintenance procedures are
described in the user documentation. The
procedures explicitly state if the operator
may perform them. Otherwise, they should
be performed only by service personnel.

Service personnel are trained to work on
live circuits, perform safe installations, and
repair products. Only properly trained ser-
vice personnel may perform installation
and service procedures.

Operator is responsible to maintain safe
operating conditions. To ensure safe
operating conditions, modules should
not be operated beyond the full
temperature range specified in the
Environmental and physical
specification. Exceeding safe operating
conditions can result in shorter
lifespans, improper module
performance and user safety issues.
When the modules are in use and
operation within the specified full

temperature range is not maintained,
module surface temperatures may
exceed safe handling conditions which
can cause discomfort or burns if
touched. In the event of a module
exceeding the full temperature range,
always allow the module to cool before
touching or removing modules from
chassis.

Keysight products are designed for use
with electrical signals that are rated
Measurement Category I and
Measurement Category II, as described
in the International Electrotechnical
Commission (IEC) Standard IEC 60664.
Most measurement, control, and data
I/O signals are Measurement Category I
and must not be directly connected to
mains voltage or to voltage sources with
high transient over-voltages.
Measurement Category II connections
require protection for high transient
over-voltages often associated with
local AC mains connections. Assume all
measurement, control, and data I/O
connections are for connection to
Category I sources unless otherwise
marked or described in the user
documentation.

Exercise extreme caution when a shock
hazard is present. Lethal voltage may
be present on cable connector jacks or
test fixtures. The American National
Standards Institute (ANSI) states that a
shock hazard exists when voltage levels
greater than 30V RMS, 42.4V peak, or
60VDC are present. A good safety
practice is to expect that hazardous
voltage is present in any unknown
circuit before measuring.

Operators of this product must be
protected from electric shock at all
times. The responsible body must
ensure that operators are prevented
access and/or insulated from every
connection point. In some cases,
connections must be exposed to
potential human contact. Product
operators in these circumstances must
be trained to protect themselves from
the risk of electric shock. If the circuit is
capable of operating at or above 1000V,
no conductive part of the circuit may be
exposed.

Do not connect switching cards directly
to unlimited power circuits. They are

intended to be used with impedance-
limited sources. NEVER connect
switching cards directly to AC mains.
When connecting sources to switching
cards, install protective devices to limit
fault current and voltage to the card.

Before operating an instrument, ensure
that the line cord is connected to a
properly-grounded power receptacle.
Inspect the connecting cables, test
leads, and jumpers for possible wear,
cracks, or breaks before each use.

When installing equipment where
access to the main power cord is
restricted, such as rack mounting, a
separate main input power disconnect
device must be provided in close
proximity to the equipment and within
easy reach of the operator.

For maximum safety, do not touch the
product, test cables, or any other
instruments while power is applied to
the circuit under test. ALWAYS remove
power from the entire test system and
discharge any capacitors before:
connecting or disconnecting cables or
jumpers, installing or removing
switching cards, or making internal
changes, such as installing or removing
jumpers.

Do not touch any object that could
provide a current path to the common
side of the circuit under test or power
line (earth) ground. Always make
measurements with dry hands while
standing on a dry, insulated surface
capable of withstanding the voltage
being measured.

The instrument and accessories must
be used in accordance with its
specifications and operating
instructions, or the safety of the
equipment may be impaired.

Do not exceed the maximum signal
levels of the instruments and
accessories, as defined in the
specifications and operating
information, and as shown on the
instrument or test fixture panels, or
switching card.

When fuses are used in a product,
replace with the same type and rating
for continued protection against fire
hazard.

iv

Summary of Contents for RF PA/FEM

Page 1: ...EM Characterization Test Reference Solution Notice This document contains references to Agilent Please note that Agilent s Test and Measurement business has become Keysight Technologies For more infor...

Page 2: ......

Page 3: ...e is customarily provided to the public Accordingly Keysight provides the Software to U S government customers under its standard commercial license which is embodied in its End User License Agreement...

Page 4: ...onnection to Category I sources unless otherwise marked or described in the user documentation Exercise extreme caution when a shock hazard is present Lethal voltage may be present on cable connector...

Page 5: ...nd is for use in electromagnetic environments outside of the home A A This product complies with the WEEE Directive marketing requirement The affixed product label above indicates that you must not di...

Page 6: ...vi...

Page 7: ...s 17 Cable and Connector Care 18 Prepare the Chassis 19 Install the Controller 20 Embedded Controller 20 Remote Controller 21 Install the M9381A and M9393A Instrument Modules 24 When installing each m...

Page 8: ...Related Documentation 43 Module Slot Location for the M9381A and M9391A 43 M9391A Cable and Options Table 44 Appendix 2 Updating the M9300A FPGA 46 Reserving the Reference for a Configuration 46 viii...

Page 9: ...urement with your M9381A VSG and M9393A VSA 7 Optional Verify PA test configuration includes connecting peripheral instru ments for your PA test solution such as Waveform generator SMU etc 8 Installat...

Page 10: ...Introduction About the RF PA FEM Characterization and Test Reference Solution 10 Keysight Y1299A 004 RF PA FEM Reference Solution Startup Guide...

Page 11: ...m M9381A device driver API references IVI C IVI COM and LabVIEW G M9381A Data Sheet M9381A Specifications Guide M9393A Vector Signal Analyzer 1 see www keysight com find M9393A M9393A Soft Front Panel...

Page 12: ...mplifier Test Demo Program User s Guide Keysight PXI Power Amplifier Test Demo Program Developer Guide Recommended Instruments and Software for Power Amplifier Test with Envelope Tracking Signadyne AW...

Page 13: ...he M9036A if necessary Monitor with M9037A Use the Display Port to VGA adaptor an accessory to the M9037A if necessary USB compatible keyboard USB compatible mouse If you are installing the software f...

Page 14: ...assemblies The figure left shows a static safe work station using two types of ESD protection conductive table mat and wrist strap combination and conductive floor mat and heel strap combination Both...

Page 15: ...th the other modules because your instrument may be repaired and calibrated without your M9300A Doing so however will effect your calibration schedule since repairs are followed by calibration The Cal...

Page 16: ...e shipping label write ATTENTION REPAIR DEPARTMENT and the RMA number In your correspondence refer to the modules by serial number and the instrument by model number Verify Shipment Contents Your solu...

Page 17: ...t damage to the module All component modules for an M9381A or M9393A instrument are factory tested aligned calibrated and shipped as a bundle It is important that you maintain the bundle when installi...

Page 18: ...Cable and Connector Care When you need to disconnect push on cables from the module front panel connectors use the Keysight Cable Removal Tool PN 5002 3361 provided in your Keysight PXI instrument s...

Page 19: ...TO and the inhibit switch is set to DEF 4 Position the chassis to provide ample space between the chassis fan intake and exhaust vents Blockage by walls or obstructions affects the air flow needed for...

Page 20: ...your solution contains a Keysight M9036A or M9037A Embedded Controller follow the procedure below For additional detail refer to instructions in the M9036A Startup Guide or the M9037A Startup Guide 1...

Page 21: ...ide The following procedure addresses using the M9021A as a cabled PCIe interface between the M9018A chassis and an external host computer However if you intend to use an M9021A module to control a su...

Page 22: ...injector ejector handle and making sure the injector ejector handle is pushed down in the unlatched downward position slide the M9021A module into chassis using the slot guides top and bottom b Slidi...

Page 23: ...ighten the module retaining screws top and bottom and torque them to 5 Lb In 0 57 N m 6 Connect the M9021A to your laptop or desktop PC a If you are using a laptop as a controller connect to your M902...

Page 24: ...handle is pushed down in the unlatched down ward position slide the module into chassis using the slot guides top and bot tom 2 Sliding the module into position when you begin to feel resistance pull...

Page 25: ...2 Install the PXI Modules Before installing the PXI Modules Keysight Y1299A 004 RF PA FEM Reference Solution Startup Guide 25 10 M9300A 11 SD AWG H3353 AWG 12 M9195A 13 M9375A VNA 14 M9375A VNA 15 M9...

Page 26: ...semi rigid SMA male SMA male 8120 5091 M9310A 100 MHz Out to M9311A 100 MHz In Cable coaxial SMB female SMB female 8120 5091 M9310A Trig 1 to M9311A Trig 1 for Pulse Mod Cable coaxial SMB female SMB...

Page 27: ...mm 8121 2169 M9365A IF Out to M9214A IF In Cable coaxial SMB female SMB female 165 mm 8121 2723 M9300A 100 MHz Out to M9308A 100 MHz In Cable coaxial SMB female SMP female 150 mm 8121 2554 M9308A 100...

Page 28: ...sight model Y1212A 5 per kit and EMC filler panels Keysight model Y1213A 5 per kit in empty module slots Power up the Chassis If you are using a remote controller you must power up the chassis BEFORE...

Page 29: ...ller external PC connected to the chassis by a PCI to PXI interface is required Embedded controller Keysight M9036A or M9037A or an embedded controller that meets the following requirements PXIe syste...

Page 30: ...393A driver 4 M9381A PXIe Vector Signal Generator version 1 4 400 0 or newer www keysight com find M9381A www keysight com find m9381a driver 5 N7624B Signal Studio for LTE LTE Advanced FDD optional w...

Page 31: ...Startup Guide 31 Order Software NOTE If you are using a remote controller use this sequence to restart the PC and chassis 1 Shut down the PC 2 Power down the chassis 3 Power up the chassis 4 Power up...

Page 32: ...oftware products that you include in your solution you receive a Software Entitlement Certificate for example Keysight Signal Studio Applications Software Keysight Waveform 5 or 50 packs optional Keys...

Page 33: ...hannel VSG VSA M9381A and M9393A configuration 1 Turn power on to the M9018A Chassis if you haven t already 2 The step in this process is to conduct a Self Test of the M9381A and the M9393A a Open the...

Page 34: ...ess or the M9301A is unlocked from the ref erence n a Not connected by the SFP Failure in the power supplies Module hardware health can t be determined until the power supply failure is resolved M9310...

Page 35: ...s resolved M9308A The Soft Front Panel has initialized the connection to the module Tuning is in progress or the M9308A is unlocked from the ref erence n a Not connected by the SFP Failure in the powe...

Page 36: ...hat was reported in a Self Test failure go to Utilities Calibration Options to view this screen The string pointed out in this image is the Cal ID The first 10 characters represent the Unique ID and t...

Page 37: ...rrect Keysight IO Libraries Suite M9381A and M9393A SFP programs Module and chassis drivers System Interface Card cable and PC PXIe card connections if you are using an external host PC If not all mod...

Page 38: ...esented with the Connect to Instrument dia log Use Ctrl Select to select all of the modules that are components of the M9381A and the M9393A and press Connect 2 Connect a high quality SMA male to SMA...

Page 39: ...nt Communications Keysight Y1299A 004 RF PA FEM Reference Solution Startup Guide 39 d ALC On checked 5 On the M9393A SFP Measure Tab make the following settings a Frequency 2 GHz b Input Power 10 dBm...

Page 40: ...ous for a sustained sweep of the analyzer You should see the following display on your SFP The frequency of the signal is 2 GHz and the amplitude is 10 dBm 7 Proceed to Step 7 Installation is Complete...

Page 41: ...s in a very different end user experience The IVI drivers support compiling application programs for 32 or 64 bit platforms Supported ADEs application development environments Arguably the most import...

Page 42: ...LabVIEW itself drivers will be installed in the Agilent directory instead of the National Instruments directory for example C Program Files x86 Agilent Agilent product model LabVIEW Driver LabVIEW ve...

Page 43: ...9391A orM9393A Startup guide M9381A VSG and M9391A VSA Programming Guide M9393A Programmers Guide M9391A device driver API references IVI C IVI COM and LabVIEW G M9393A device driver API references IV...

Page 44: ...ale SMA female 8120 5091 M9300A 100 MHz Out 1 to M9301A 100 MHz In Cable coaxial SMB female SMB female 120 mm 8120 5091 M9301A 100 MHz Out to M9350A 100 MHz In Cable coaxial SMB female SMB female 120...

Page 45: ...M9391A F06 F06 Frequency Range 1 MHz to 6 GHz M9391A UNZ Fast Switching M9391A B04 Analysis Bandwidth 40 MHz M9391A B10 Analysis Bandwidth 100 MHz M9391A B16 Analysis Bandwidth 160 MHz M9391A M01 Memo...

Page 46: ...the hardware configuration so that a subsequent instance will not take control of the reference module unintentionally 1 On the SFP Connect to Instrument screen click the Advanced control to open the...

Page 47: ...This Page Intentionally Left Blank Keysight Y1299A 004 RF PA FEM Reference Solution Startup Guide 47...

Page 48: ...This information is subject to change without notice Keysight Technologies 2013 2015 Edition 2 July 2015 Printed In USA Y1299 90004 www keysight com...

Reviews: