Installation Note N5222-90131 15
Description of the Upgrade
Installation Procedure for the Upgrade
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
Overview of the Installation Procedure
“Step 1. Obtain a Keyword and Verify the Information.”
“Step 2. Remove the Outer Cover.”
“Step 3. Remove the Inner Cover.”
“Step 4. Remove the Front Panel Assembly.”
“Step 5. Remove the A19 Test Set Motherboard.”
“Step 6. Disconnect A71 and A74 Bias-Tee Combiner’s LFE Cables From the
A70 Low Frequency Extension (LFE) Board and the Ends of the LFE Cables
Connected to the IF Multiplier (IF MUX) Board.”
“Step 7. Remove the A75 Low Frequency Extension (LFE) Board.”
“Step 8. Remove Some Low Frequency Extension (LFE) Cables (8120-5014
(x1), 8120-5021 (x1), N5240-60097 (x1), and N5240-60098) From the IF
Multiplexer (IF MUX) Board.”
“Step 9. Remove Some of the Mixer Brick (MXB) Cables.”
“Step 10. Remove Some Gray Cables From the A20 IF Multiplexer Board.”
“Step 12. Remove Some Bottom-Side Semi-Rigid Test Set Cables.”
“Step 11. Remove the A70 LFE Board Bracket.”
“Step 13. Remove the A23 Mixer Brick Assembly.”
“Step 14. Assemble the A24 Mixer Brick and A22 Splitter Assemblies.”
“Step 15. Install the A23/A24 Mixer Brick Brick Assembly.”
“Step 16. Assemble the A26 and A27 Receiver Bridge Assemblies.”
“Step 17. Install the A26 and A27 Receiver Bridge Assemblies.”
“Step 18. Assemble A35/A36 Source and A43/A44 Receiver Attenuators.”
“Step 19. Install A35/A36 Source and A43/A44 Receiver Attenuators.”
“Step 20. Assemble the A72 (Port 3) and A73 (Port 4) Bias Tee Combiner
This installation requires the removal of the analyzer’s protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.