Kesla
®
XS
190
SELF PROPELLED TELESCOPIC PLATFORM
69
Other repairs
Any other repairs of the load-bearing structures (e.g. cylinder) must also be entered in the
inspection journal under "Remarks", including the following information:
-
Location of the repair
-
Date
-
Name of the person who carried out the repair
Make sure that the manufacturer's instructions have been observed. Use original spare
parts in all repairs.
Test loading (= overloading)
After repairs of load-bearing structures the Access Platform must be tested while being
loaded according to standard EN280. The test load used must be entered in the inspection
journal. After loading, check carefully for any tears or permanent deformations on the
loaded components. The test load should be 125% of the maximum nominal load.
Summary of Contents for XS 190
Page 1: ...190 SELF PROPELLED TELESCOPIC PLATFORM OPERATION MAINTENANCE ...
Page 6: ...Kesla XS 190 SELF PROPELLED TELESCOPIC PLATFORM 5 TRANSPORT DIMENSIONS ...
Page 8: ...Kesla XS 190 SELF PROPELLED TELESCOPIC PLATFORM 7 SPECIFICATION FRONT ...
Page 83: ...Kesla XS 190 SELF PROPELLED TELESCOPIC PLATFORM 82 ...