Section 2: S535 site preparation and installation
S535 Wafer Acceptance Test System Administrative Guide
2-2
S535-924-01 Rev. B / January 2019
S535 system preparation checklist (continued)
Floor plan Did you take future expansions into consideration?
Electrical
power
Item
Is there sufficient space for any supplies or manuals?
Is adequate and proper electrical power available (see
(on page 2-20) for
specifications)?
Is anything connected to the same power source that generates noise?
Is anything that requires substantial amounts of current connected to the same power source?
Did you prepare power outlets for service, testing, or maintenance?
Unpacking the S535 system
The Keithley field service engineer (FSE) is responsible for unpacking the S535 system cabinet and
the accessories. However, we recommend that you move the crate and the accessories box to the
area where the system is going to be used.
Here is a list of tools needed for unpacking:
Safety glasses
Gloves
Standard screwdriver
Socket wrench
Socket head: 19 mm (3/4 in.)