OPERATING THE MACHINE
5-16
Grading
WARNING: When operating a machine equipped
with ride control and the lift arm control lever in
the float position, when performing works as soil
scooping, land grading, or snow removal, be sure to
turn the ride control switch OFF. Failure to do so may
allow the ride control system to operate so that the
front attachment may automatically move up and
down.
IMPORTANT: Perform grading work while moving the
machine in reverse. If grading work is performed
by moving the machine forward, severe loads are
applied to the front attachment, possibly creating
cracks or damage to the front attachment.
1. After filling the bucket, dump the bucket gradually to
spread soil while moving the machine in reverse.
2. Lower the bucket teeth tips onto the ground.
Grade and level the ground surface while driving
the machine in reverse with the bucket teeth tips
dragging.
3. After filling the bucket with a load such as soil, position
the bucket level with the ground surface. Finish the
ground surface utilizing the bucket weight.
At this time, move the machine in reverse with the lift
arm held in the FLOAT position.
M4GB-05-011
M4GB-05-012
M4GB-05-013
Summary of Contents for 70Z7
Page 2: ...93108 00691 April 2015...
Page 5: ......
Page 11: ...MACHINE NUMBERS 2 MEMO...
Page 51: ...SAFETY LABELS S 40 6 10 4 1 3 9 6 5 SS 3461...
Page 171: ...OPERATOR S STATION 1 110 MEMO...
Page 173: ...BREAK IN 2 2 MEMO...
Page 187: ...OPERATING THE ENGINE 3 14 MEMO...
Page 231: ...OPERATING THE MACHINE 5 24 MEMO...
Page 359: ...MAINTENANCE 7 118 MEMO...
Page 363: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO...
Page 367: ...STORAGE 10 4 MEMO...