30
Step
Procedure
Reference
1
Open the lower front cover and check the following
items in regular intervals:
2
The air hose of the air-conditioning unit must not have
any kinks.
see also
Section 5.10
3
The filter mats in the base section and in the canopy
section must be clean.
see also
Section 5.7
4
Check the exhaust air hose for kinks or damages,
and if there is an additional ventilator due to hose
overlength, check its function as well.
5
An adequate ventilation and air extraction in the studio
must be guaranteed at any time.
6
Check the correct position of the duct pane to make
sure that the base pane is adequately cooled.
Operation and Service KBL 5600
Maintenance of
the exhaust air
system and the
air-conditioning
A clean and trouble-free exhaust air system prevents the
apparatus from overheating. The maximum hose length of 6 m
must not be exceeded unless there is an additional ventilator.
5.11 Air-conditioning unit
Air hose
Fan
Condensation
hose leads
outside to the
condensate tank
Condensate pump
Checks
Check the heat exchangers of the air-conditioning unit for dirt
particles each time a tube is replaced. Dirty heat exchangers
reduce the performance of the air-conditioning unit.
Open the front cover and vacuum-clean the heat exchangers, if
necessary.
Check the connection hose each time the tubes are replaced.
Defective hoses must be replaced.
Summary of Contents for megaSun 5600
Page 1: ...Operating and Maintenance KBL 5600 BA_5600_US_L 0707...
Page 56: ......