Insulation Work
Installation
67
2.2 Power on and let the air conditioner operate for cooling. Check operation status of drainage pump, and
then connect the plug of water level switch, check the operation sound of water pump and observe
whether the water can discharge through the transparent hard pipe at drainage outlet.
(In light of the
length of drainage pipe, water shall be discharged about 1 minute delayed)
2.3 Stop the operation of air conditioner, power off the power supply and put the cover of water test hole
back to the original place.
a. After stopped the air conditioner 3 minutes, check whether there is anything abnormal. If drainage pipes
have not been distributed properly, over back-flow water shall cause the flashing of alarm indicator at
remote-controlled receiving board and even water shall run over the water collector.
b. Continuously infusing water until water level alarmed, check whether the drainage pump could
discharge water at once. If water level does not decline under warning water level 3 minutes later, it
shall cause shutdown of unit. When this situation happens, the normal startup only can be recovered by
turning down power supply and eliminating accumulated water.
Note: Drain plug at the main water-containing plate is used for eliminating accumulated water in
water-containing plate when maintaining air conditioner fault. During normal operation, the plug shall be
filled in to prevent leakage.
6.4 Insulation work of drainage pipe
Refer the introduction to the insulation engineering parts.
7. Vacuum Drying and Leakage Checking
7.1 Purpose of vacuum drying
Eliminating moisture in system to prevent the phenomena of ice-blockage and copper oxidation.
Ice-blockage shall cause abnormal operation of system, while copper oxide shall damage compressor.
Eliminating the non-condensable gas (air) in system to prevent the components oxidizing, pressure
fluctuation and bad heat exchange during the operation of system.
7.2 Selection of vacuum pump
The ultimate vacuum degree of vacuum pump shall be -756mmHg or above.
Precision of vacuum pump shall reach 0.02mmHg or above.
7.3 Operation procedure for vacuum drying
Due to different construction environment, two kinds of vacuum drying ways could be chosen, namely
ordinary vacuum drying and special vacuum drying.
7.3.1 Ordinary vacuum drying
Summary of Contents for Zen On 2014
Page 1: ...Contents i Service Manual 2014 ...
Page 2: ......
Page 3: ...Contents i ...
Page 4: ......
Page 6: ......
Page 18: ...Wiring Diagrams 12 Duct Type 4 Wiring Diagrams KPD 140 HN6 KPD 176 HN6 ...
Page 24: ...Field Wiring 18 Duct Type 10 Field Wiring KPD 140 HN6 KPD 176 HN6 ...
Page 41: ...Service Space Ceiling Floor Type 35 3 Service Space ...
Page 42: ...Wiring Diagrams 36 Ceiling Floor Type 4 Wiring Diagrams KPC 140 HN6 KPC 176 HN6 ...
Page 45: ...Field Wiring Ceiling Floor Type 39 9 Field Wiring KPC 140 HN6 KPC 176 HN6 ...
Page 50: ...Wiring Diagrams 44 Outdoor Units 4 Wiring Diagrams KUE 140 HTN6 KUE 176 HTN6 ...
Page 95: ...Troubleshooting Electrical Control 89 f Indoor fan speed has been out of control Eb ...
Page 98: ...Troubleshooting 92 Electrical Control c Up down panel is not closed ...
Page 103: ...Controller Electrical Control 97 3 Controller 3 1 KI 01 Wireless Remote Controller Optional ...
Page 115: ......
Page 116: ......