250kW module
Load distribution
Unit: kg
No
Model
R1
R2
R3
R4
R5
R6
1
KEM-30 DHN3
81
68
139
112
/
/
2
KEM-65 DHN3
170
180
145
155
/
/
3
KEM-130 HN3
350
340
295
285
/
/
4
KEM-200 HN3
567
433
567
433
/
/
5
KEM-250 HN3
373
344
487
462
539
395
11.4 Installation of damping devices
Damping devices must be provided between the unit and its foundation.
By means of the Φ15mm diameter installation holes on the steel frame of the unit base, the unit can be
fastened on the foundation through the spring damper. See
figure above
(Schematic diagram of installation
dimension of the unit) for details about center distance of the installation holes. The damper does not go with
the unit, and the user can select the damper according to the relevant requirements. When the unit is
installed on the high roof or the area sensitive to vibration, please consult the relevant persons before
selecting the damper.
Installation steps of the damper
Schematic diagram of installation dimension of the unit
Drainage
channel
Hole for anchor bolt
Concrete
Cement mortar
Drainage channel
30kW
65kW
130kW
200kW
250kW
Summary of Contents for KEM-30 DNH3
Page 2: ......
Page 5: ...2 1 2 External appearance KEM 130 HN3 KEM 200 HN3 KEM 250 HN3 KEM 30 DHN3 KEM 65 DHN3 ...
Page 33: ...30 130kW module ...
Page 35: ...32 250kW module ...
Page 39: ...36 200kW module ...
Page 73: ...130kW module 200kW module Input of airflow Input of airflow Input of airflow Input of airflow ...
Page 159: ......
Page 160: ......