– 41 –
INSULOK tie T-18R
* Face the bindig part
to this side
FPGA relay(2) cable
Tighten together with ground terminal
Wiring diagram
Sensor relay(1) cable
【C】D-sub Box
Assembling.Instruction
1. Fasten SFPGA PWB assy ② on FPGA PWB cover assy ① with four screws ⑤ .
*.Install.assy.in.the.direction.shown.in.the.drawing.
2. Insert sensor relay (1) into the hole of FPGA PWB cover assy ① , then fasten D-sub connector ③ and
D-sub spring ④ with two screws ⑤ .
3. Connect sensor relay (1) to the two connectors on the FPGA PWB.
4. Connect sensor relay (2) to one connector on the FPGA PWB, then fasten it with INSULOK tie.
No..
Description.
Description
Remarks.
PN.
1. FPGA.PWB.Cover.Assy.
FPGA.PWB.cover.assy.
910121.
2. FPGA.PWB.Assy.
FPGA.PWB.assy.
KEP-267.(2).
238361.
3. D-sub.Socket..
(SENSOR.Relay.(1).Cable).
D-sub.socket..
(Sensor.relay.(1).cable).
Sensor.relay.(1).cable.
950669.
4. D-sub..Spring.
D-sub.Spring
D110277.
950683.
5. +.BINDING.TAPTITE.SCREW.
S.TITE.
.+.Binding.taptite.screw.S.tite. M3.x.6.
812255