58
TRACK INSTALLATION
DISASSEMBLY
1. Attach a bucket to the Loader, ensuring the attachment Locking Pins are fully engaged.
2. Position the Loader on level, solid ground for a stable working base.
3. Place suitable wooden blocks or stands under the flat section of the Loader base at the rear of
the Loader.
4. Place the bucket flat on the ground.
5. Tilt the bucket forward (as if dumping) and the Loader will lift clear of the ground, supported by
the block and the bucket.
6. When tracks are clear of ground at both ends, place another wooden block or a stand under
the base at the front of the Loader.
7. Deflate tyres to 25psi.
8. Remove the wheel nuts and use a suitable lever to remove the front wheel from the hub.
Repeat for the rear wheel.
STEP 3
STEP 5
TRACKS OFF
THE GROUND
Summary of Contents for 8D Series
Page 1: ...8D SERIES OPERATOR S MANUAL WWW KANGALOADER COM 1300 4 KANGA PM 000130 ...
Page 2: ......
Page 69: ...69 DIMENSIONS 8 SERIES ...
Page 74: ......
Page 75: ......