10
PREPARATION FOR USE
INSPECTION AFTER DELIVERY
When the machine is delivered, it should be inspected for any evidence of damage caused as a
result of shipment before it is declared ready for use. The preparation of the mini loader for use
should only be undertaken by a responsible person who has read and understood this manual. The
requirements are simple and coupled with the use of good common sense, together with general
occupational health and safety knowledge and a visual inspection, should not pose any problems.
The following checklist provides suggestions for detecting defective or damaged parts.
CHECK BEFORE USE
1
Inspect the machine chassis for any visible damage.
2
Visually inspect all components to ensure they are attached securely.
3
Inspect all areas for evidence of hydraulic oil, engine oil or fuel leakage.
4
Inspect Arm assembly area for firm attachment and sufficient lubrication. Check
hydraulic cylinders for oil leakage and visible damage.
5
Check hydraulic oil lines for correct connection and for signs of leakage.
6
Check wheel and tyre assemblies for loose or missing wheel nuts, any visible
damage and proper tyre inflation.
7
Check wheel drive motor assemblies for any visible damage and oil leakage.
8
Inspect all cylinders for rust, nicks, scratches or foreign material on shafts. Check for
hydraulic oil leaks at the seal and fitting areas.
9
Inspect the engine compartment for loose or missing components and any evidence
of damage or leakage.
10
Check the hydraulic fluid level is within operating limits as marked on the
Sight Gauge.
11
Check the engine oil level is within operating limits as marked on the Dip Stick.
SAFETY
Summary of Contents for 8D Series
Page 1: ...8D SERIES OPERATOR S MANUAL WWW KANGALOADER COM 1300 4 KANGA PM 000130 ...
Page 2: ......
Page 69: ...69 DIMENSIONS 8 SERIES ...
Page 74: ......
Page 75: ......