TECHNICAL DESCRIPTION flowIQ® 3100
50
Ka st up A/S • Te h i al Des iptio •
5512-1242_D
_GB •
09.2016
As soon as the button is activated, serial optical communication between Pulse Adapter and meter starts.
If the set up is su essful,
PULSE ON
is displa ed fo fi e se o ds as sho elo a d the LED o the u it
remains ON for three seconds
–
shown in the figure below.
It takes only a very short time from setup is started until it is completed.
Display, after set-up
Having set up the meter, remount the cover on the Pulse Adapter and fasten the three screws.
12.5
Pull-up
The acquisition unit must have built-in
pull
-
up
–
shown in figure below
–
to ensure correct voltage level of
the pulse. The pulse output is two-wired and must be connected as follows:
Opsamlingsenhed
+
-
2
Pull-up
Sketch for connection of Pulse Adapter
Acquisition unit