Optisure Remote User’s Manual
2
March 2018
INSTALLATION
2
INSTALLATION
2.1
Safety
!
It is essential that the installation of the electrical and gas
connections to this instrument be undertaken by competent
personnel.
2.2
Unpacking the Instrument
Open the box and unpack carefully. Save all the packing materials for the purpose of
returning the instrument for re-calibration or any warranty claims.
The accessories box should contain the following items:
•
Traceable calibration certificate
•
SD memory storage card
•
Optics cleaning kit
•
USB communications cable
•
Remote Pt100 temperature probe
•
IEC power cable
•
Sensor cable
•
Dew-point sensor
•
Pressure transducer and cable (optional)
If there are any shortages please notify Kahn Instruments immediately
Summary of Contents for Optisure Remote
Page 1: ...Optisure Remote Chilled Mirror Hygrometer User s Manual March 2018...
Page 2: ...Optisure Remote...
Page 7: ...Optisure Remote User s Manual Kahn Instruments vii NOTES...
Page 46: ...Optisure Remote User s Manual Kahn Instruments 39 APPENDIX B Appendix B...
Page 53: ...Optisure Remote User s Manual 46 March 2018 Optisure Series Variables Editor Screen...
Page 54: ...http www kahn com...