12 Decommissioning, Storage and Transport
12.1 Putting Out of Operation
This is necessary under the following circumstances:
■ The machine is temporarily not needed.
■ The machine is to be moved to another location.
■ The machine is to be scrapped.
Temporarily putting out of operation
Precondition The machine can be started at regular intervals.
➤ Run the machine once a week for at least 30 minutes under LOAD to ensure sufficient protection
against corrosion.
Putting out of operation for a longer period
Precondition Before putting out of operation, the machine should be run under LOAD for at least 30 minutes.
Switch off the power supply disconnecting device,
the disconnect device is locked in the off position,
check that no voltage is present.
Machine fully vented (no pressure).
1. Allow the machine to cool down completely.
2. Disconnect all air and electrical connections.
12.2 Packing
A wooden crate is required for ground transport to protect the machine from mechanical damage.
Consult an authorized KAESER Service representative for advice on packing for sea or air transport.
Material Desiccant
Plastic sheeting
Wooden transport crate
Precondition The machine is decommissioned.
Machine is dry and cooled down.
1. Place desiccant inside the machine cabinet.
2. Wrap the machine in plastic sheeting.
12.3 Storage
Moisture can lead to corrosion, particularly on the surfaces of the airend and oil separator tank.
Frozen moisture can damage components, diaphragms, valves and gaskets.
Advice can be obtained from KAESER on storage and re-commissioning.
12 Decommissioning, Storage and Transport
12.1 Putting Out of Operation
Number: 9_6945 01USE
Service manual Screw compressor
Aircenter SX 3/7.5 SIGMA CONTROL BASIC
81