
Generator 115 V/2~; 7 kVA:
Fig. 25 Insulation monitoring - 115 V single phase generator
1
«Generator main switch»
2
«Mode selector switch»
3
Test button with
earth leak warning lamp
for «insulation monitoring»
4
«Mains circuit breaker»
(«Circuit breaker» designed as automatic
circuit-breaker with shunt trip)
5/6
Single-phase AC power sockets
1. Start the machine.
2.
Risk of fatal injury caused by contact with live components!
➤ The generator may only be used if the «circuit breaker» («mains circuit breaker») has trip‐
ped during the test!
3. Check the insulation monitor according to instructions:
Checking instructions are given on the label attached to the generator control box.
DANGER!
Electrical power
Risk of fatal injury caused by contact with live components!
▶ Test the «mains circuit breaker» each day while the machine is running.
▶ The generator may only be operated if the «mains circuit breaker» is functioning correctly.
Checking the «safety cut-out»:
➤ Switch on the «mains circuit breaker» for the generator.
➤ Press and hold the «test button» for 3 seconds.
The «mains circuit breaker» trips out.
Problem: The «mains circuit breaker » does not trip out.
➤ Shut down the generator and call KAESER SERVICE.
Tab. 68 Test instructions for a generator with an earth leak detection device.
7
Initial Start-up
7.6
Activating the generator
No.: 901783 08 USE
Operator Manual Portable Rotary Screw Compressor
MOBILAIR M82 SIGMA CONTROL SMART
75