Table 32 provides a summary checklist of the pre-installation requirements. You should
complete and review this checklist with field engineers to ensure the installation site is
prepared for installing the G10 CMTS.
Table 32: Pre-Installation Requirement Summary Checklist
Requirement
Verified
Safety
Grounding straps provided for ESD protection
Compliance verified with all local and national regulatory requirements
Equipment to be positioned in a clear, dry, dust-free area
Power
AC Power
AC-input supply operates within range of 100 to 240 VAC and 47 to 63 Hz
Appropriate circuit protection in place for compliance with area electric regulations
Separate AC-input power supply sources for CMTS A and B domains
DC Power
DC-input supply operates within range of –36 to –75 VDC
Appropriate circuit protection in place for compliance with area electric regulations
Separate DC-input power supply sources for CMTS A and B domains
Environment
Ambient temperature conditions satisfied
Ambient humidity conditions satisfied
Altitude conditions satisfied
Vibration conditions satisfied
Mounting
19-inch rack, 23-inch rack, or appropriate non-standard rack or shelf available
Cable organizer available for mounting rack
Adequate access clearance to front, rear, and sides of CMTS
Hardware
Specified tools and supplies available
Test equipment available for installation and verifying RF setup
Installation Site
Characterization of RF Plant/HFC environment parameters completed
Characterization of existing DOCSIS services completed
Characterization of upstream CMTS parameters completed
Characterization of downstream CMTS parameters completed
Summary of Contents for G10 CMTS
Page 8: ... JUNOSg 3 0 G10 CMTS Hardware Guide viii ...
Page 18: ... JUNOSg 3 0 G10 CMTS Hardware Guide 2 ...
Page 34: ...G10 CMTS Hardware Overview JUNOSg 3 0 G10 CMTS Hardware Guide 18 ...
Page 82: ... JUNOSg 3 0 G10 CMTS Hardware Guide 66 ...
Page 112: ...Rack Mounting JUNOSg 3 0 G10 CMTS Hardware Guide 96 Figure 25 Air Flow Through Chassis ...
Page 148: ... JUNOSg 3 0 G10 CMTS Hardware Guide 132 ...
Page 156: ...Upstream RF Measurement JUNOSg 3 0 G10 CMTS Hardware Guide 140 ...
Page 188: ... JUNOSg 3 0 G10 CMTS Hardware Guide 172 ...
Page 196: ...Radio Frequency RF Specifications JUNOSg 3 0 G10 CMTS Hardware Guide 180 ...
Page 202: ...EIA Channel Plans JUNOSg 3 0 G10 CMTS Hardware Guide 186 ...
Page 203: ... 187 Part 5 Index Index on page 189 ...
Page 204: ... JUNOSg 3 0 G10 CMTS Hardware Guide 188 ...
Page 210: ... Index JUNOSg 3 0 G10 CMTS Hardware Guide 194 ...