C Transportation and commissioning
1
Transport
Depending on the overall height of the lifting mast and the local conditions transport
can be performed in two different ways:
– Standing, with lifting mast and load-carrying unit assembled
(for low overall height)
– Standing, with lifting mast and load-carrying unit disassembled
(for large overall height)
m
The assembly of the truck on site, commissioning the truck and instructing the driver
must be carried out by personnel trained and authorised by the manufacturer.
2
Transportation by crane
m
Use only hoisting equipment with appropriated carrying capacity (refer to the truck ID
plate for truck weight, see chapter B). Observe additional battery weight!
– Safe parking of the truck (refer to chapter E)
– With the mast removed, crane lifting points are at the front of the chassis where the
mast is screwed on and at the rear, where two lugs are mounted.
– With the mast installed, crane lifting points are at the top of the mast and the two
rear lugs.
m
Attach the crane hoisting equipment at the lifting points in such a way that it cannot
slip for any reason!
m
The crane hoisting gear must be attached in such a way that it cannot damage any
attached components or the overhead guard during lifting.
Transportation by crane, with mast
Transportation by crane, without mast
C 1
501
1
838
6 GB
C Transportation and commissioning
1
Transport
Depending on the overall height of the lifting mast and the local conditions transport
can be performed in two different ways:
– Standing, with lifting mast and load-carrying unit assembled
(for low overall height)
– Standing, with lifting mast and load-carrying unit disassembled
(for large overall height)
m
The assembly of the truck on site, commissioning the truck and instructing the driver
must be carried out by personnel trained and authorised by the manufacturer.
2
Transportation by crane
m
Use only hoisting equipment with appropriated carrying capacity (refer to the truck ID
plate for truck weight, see chapter B). Observe additional battery weight!
– Safe parking of the truck (refer to chapter E)
– With the mast removed, crane lifting points are at the front of the chassis where the
mast is screwed on and at the rear, where two lugs are mounted.
– With the mast installed, crane lifting points are at the top of the mast and the two
rear lugs.
m
Attach the crane hoisting equipment at the lifting points in such a way that it cannot
slip for any reason!
m
The crane hoisting gear must be attached in such a way that it cannot damage any
attached components or the overhead guard during lifting.
Transportation by crane, with mast
Transportation by crane, without mast
Summary of Contents for ETX ac 125
Page 1: ...Operating instructions 50118386 ETX ac 125 150 G 01 01 05 03...
Page 3: ...0108 GB...
Page 7: ...50118386 GB I 4...
Page 9: ...A 2 50118386 GB...
Page 16: ...B 7 50118386 GB...
Page 21: ...B 12 50118386 GB...
Page 25: ...C 4 50118386 GB...
Page 44: ...E 15 50118386 GB Display symbol assignment...
Page 45: ...50118386 GB E 16 Display symbol assignment Time of day Height display Operating hours...
Page 73: ...50118386 GB E 44...
Page 81: ...50118386 GB F 8 g Glide surfaces s Lubricator nipples...