33
5 Noncyclical data exchange
Setpoint values controller 1 parameter level
Setpoint values controller 2 parameter level
Setpoint values controller 3 parameter level
Setpoint values controller 4 parameter level
5.2.2
Process values
Current controller setpoint values
External analog signals
2
96
7
15
0
TK1 minimum pick-up time of 1st relay
REAL
Read/Write
2
96
7
16
0
TK2 minimum pick-up time of 2nd relay
REAL
Read/Write
2
96
7
17
0
Maximum pulse frequency 1
UINT
Read/Write
2
96
7
18
0
Maximum pulse frequency 2
UINT
Read/Write
2
96
7
19
0
Pick-up delay 1
REAL
Read/Write
2
96
7
20
0
Pick-up delay 2
REAL
Read/Write
2
96
7
21
0
Drop-out delay 1
REAL
Read/Write
2
96
7
22
0
Drop-out delay 2
REAL
Read/Write
2
96
7
23
0
Alarm tolerance
REAL
Read/Write
2
96
7
24
0
Alarm delay
UINT
Read/Write
Index
Signal designation
Data type
Access
Index
Signal designation
Data type
Access
2
98
0
0
0
Setpoint value W1 (controller 1)
REAL
Read/Write
2
98
0
1
0
Setpoint value W2 (controller 1)
REAL
Read/Write
Index
Signal designation
Data type
Access
2
98
1
0
0
Setpoint value W1 (controller 2)
REAL
Read/Write
2
98
1
1
0
Setpoint value W2 (controller 2)
REAL
Read/Write
Index
Signal designation
Data type
Access
2
98
2
0
0
Setpoint value W1 (controller 3)
REAL
Read/Write
2
98
2
1
0
Setpoint value W2 (controller 3)
REAL
Read/Write
Index
Signal designation
Data type
Access
2
98
3
0
0
Setpoint value W1 (controller 4)
REAL
Read/Write
2
98
3
1
0
Setpoint value W2 (controller 4)
REAL
Read/Write
Index
Signal designation
Data type
Access
2
177
0
1
0
Setpoint value controller 1
REAL
Read
2
177
1
1
0
Setpoint value controller 2
REAL
Read
2
177
2
1
0
Setpoint value controller 3
REAL
Read
2
177
3
1
0
Setpoint value controller 4
REAL
Read
Index
Signal designation
Data type
Access
2
196
0
0
0
External analog input 1
REAL
Read
2
196
1
0
0
External analog input 2
REAL
Read
2
196
2
0
0
External analog input 3
REAL
Read
2
196
3
0
0
External analog input 4
REAL
Read
Summary of Contents for AQUIS touch P
Page 2: ......
Page 4: ...Contents...
Page 6: ...1 Safety information 6...
Page 8: ...2 Compatibility and system requirements 8...
Page 10: ...3 Electrical connection 10...
Page 46: ...6 Project planning 46...
Page 48: ...7 Error messages 48...
Page 49: ...49 8 Annex 8 Annex 8 1 PROFINET certificate...
Page 50: ...8 Annex 50...
Page 51: ......