– 12 –
3-13. Managing the cord
1
1) Fix the cords with cords setting plate
1
in the state that the cords are slack to such an extent that
stress is not applied to the cords even when the machine head is tilted as shown in the figure.
Slack
3-14. Connecting the pneumatic components (Pneumatic type only)
1) Install regulator
1
to installing plate
2
, and
install it to the stand with screw
3
, washer
4
and nut
5
.
2) Connect the cord coming from the regulator
with CN78 (air relay cable).
(Refer to
-3-11. [Wiring diagram of circuit board]"
1
2
3
4
5
3) Install solenoid valve asm.
8
to solenoid valve
installing plate
6
using setscrew
7
supplied
as accessories.
8
6
7